Center
On June 26th, Shijiazhuang No. 1 and 3 rail transit lines were formally tested and operated, with the instruction made by Shijiazhuang city leader followed by a start of the train departure and moved slowly. Automatic fare collection system and clearing center in engineering construction undertaken by Panda Information for Shijiazhuang city rail transit (hereinafter referred to as the "Shijiazhuang subway ACC project") which has fully accelerated Shijiazhuang city entered into the "era of subway".
It is reported that Shijiazhuang subway ACC system as the main window of Shijiazhuang rail transit line network AFC system coordination and ticket information services and management, with unified formulation, issuance and management of rail transit special ticket, and it is responsible for the public trans smart card clearing, balance of account and other relevant business of the Ministry of Transportation. Shijiazhuang Metro ACC project started construction in October 2014, after the design liaison, production supply, installation and commissioning, integration testing and comprehensive integration phases. In the past 3 years, Panda engineering technicians have overcome many difficulties and have been long stationed at the site of the construction site. They have worked hard and made a great contribution to the construction of Shijiazhuang rail transit operation and development.
Shijiazhuang city subway opened the trial operation and created a "three first", which is the first subway opened in the city of Hebei Province, and also is the first to open with two lines of the city simultaneously, the city is also the first domestic opening day to use the public smart card of the Ministry of Transportation, while the technical difficulty of implementation is extremely high. Panda Information engineering technicians have made great efforts in tackling various key problems. They have developed various new technologies and applied it in the subway ACC system and to ensure the smooth opening and operation of Shijiazhuang metro. In the opening test operation day, the enthusiasm of the public to take the subway is very high, the total passengers flow in and out over the station with more than 300,000, and the total number of scanned card entry and exit station more than 250,000 passengers, the "Panda" construction of the ACC system, which has withstood a multi-test.
Shijiazhuang Metro ACC system, is the fourth ACC projects after Nanjing, Wuxi and Hefei where all constructed by Panda Information, which is the perfect interpretation of AFC technical strength in the field of rail transit by Panda Information that marking the "Panda" has become the domestic first-class rail transit AFC/ACC system integrator. The left picture above was Shijiazhuang people passing through "Panda" construction of the metro gates.